[Case Study] Installation of a Clean Lab on Factory Premises
Installation of a clean lab within the factory premises.
The manufacturer of the crusher needed to improve the working environment for contract processing of crushing and micronization. Operations were being conducted in a corner of the factory, but there was a risk of foreign matter contamination during the input of raw materials for crushing. Customer surveys also indicated a demand for improvements in the working environment, and the establishment of a clean lab was required to align with the trend of advancing micronization. Additionally, since cleaning with organic solvents was involved in the work, not only was it necessary to ensure cleanliness, but exhaust equipment compliant with various regulations, such as the Labor Safety and Health Act, was also required. Issues: 1. Increased risk of foreign matter contamination during nano-level crushing processing (as pointed out by customers). 2. Appropriate exhaust equipment is necessary due to the use of organic solvents. 3. Considering the possibility of changing the layout of the crusher and workability, a large space without columns is more user-friendly. 4. Temperature control is necessary to maintain consistent testing conditions.
- Company:蒲田工業
- Price:Other